Do you have any question about this error?
Message type: E = Error
Message class: /PLMI/BO_MBOM -
Message number: 047
Message text: Version &1 already exists for this BOM
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PLMI/BO_MBOM047
- Version &1 already exists for this BOM ?The SAP error message
/PLMI/BO_MBOM047 Version &1 already exists for this BOM
typically occurs when you are trying to create or modify a Bill of Materials (BOM) in SAP, and the system detects that a version of the BOM with the same identifier already exists. This can happen in various scenarios, such as when you are trying to create a new version of an existing BOM or when you are attempting to save changes to a BOM that already has a version with the same number.Cause:
- Duplicate Version: The most common cause is that you are attempting to create a new version of a BOM that already has a version with the same number.
- Incorrect Data Entry: There may be a mistake in the data entry where the version number is not unique.
- System Configuration: The system may be configured to prevent the creation of duplicate versions for BOMs.
Solution:
Check Existing Versions: Before creating a new version, check the existing versions of the BOM to see if the version number you are trying to use is already in use. You can do this by navigating to the BOM display transaction (e.g., CS03) and entering the BOM number to view its versions.
Use a Unique Version Number: If you find that the version number is already in use, you will need to use a different, unique version number for the new BOM version you are trying to create.
Change Existing Version: If you intended to modify an existing version, you can do so by selecting the correct version in the BOM display and making the necessary changes.
Consult Documentation: If you are unsure about the versioning process or how to manage BOMs in your specific SAP environment, refer to the SAP documentation or consult with your SAP administrator.
Check Authorization: Ensure that you have the necessary authorizations to create or modify BOM versions in the system.
Related Information:
By following these steps, you should be able to resolve the error and successfully manage your BOM versions in SAP.
Get instant SAP help. Start your 7-day free trial now.
/PLMI/BO_MBOM046
Item not valid for change number &1 valid from &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PLMI/BO_MBOM045
Change number &1 has status &2 and does not allow changes
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PLMI/BO_MBOM048
Item Category &1 is not supported.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PLMI/BO_MBOM049
Bill Of Material already exists in draft mode
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.