Do you have any question about this error?
Message type: E = Error
Message class: /PLMI/BO_MBOM -
Message number: 019
Message text: Bill of material &1 successfully created
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PLMI/BO_MBOM019
- Bill of material &1 successfully created ?The SAP error message
/PLMI/BO_MBOM019
indicates that a Bill of Material (BOM) has been successfully created. This message is not an error in the traditional sense; rather, it is an informational message that confirms the successful creation of a BOM in the system.Cause:
Since this message indicates success, there is no action required to resolve an error. However, if you are looking for further steps or actions to take after receiving this message, consider the following:
Verify BOM Details: After the message appears, you may want to check the details of the newly created BOM to ensure that all components and configurations are correct.
Documentation: Document the creation of the BOM for future reference, especially if it is part of a larger project or production process.
Integration: If the BOM is part of a larger workflow (e.g., production planning, material requirements planning), ensure that it is integrated correctly with other modules in SAP.
Testing: If this BOM is to be used in production or planning, consider running tests to ensure that it behaves as expected in the system.
CS01
- Create BOMCS02
- Change BOMCS03
- Display BOMIf you encounter any issues or unexpected behavior after this message, it may be worth checking for any related error messages or logs that could provide more context.
Get instant SAP help. Start your 7-day free trial now.
/PLMI/BO_MBOM018
Bill of material &1 already exists; delete existing BOM first
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PLMI/BO_MBOM017
You do not have authorization to use engineering change number &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PLMI/BO_MBOM020
Data of bill of material &1 successfully deleted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PLMI/BO_MBOM021
Material BOM saved
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.