How To Fix /PLMI/AL_GSS_R2MR_SU081 - You cannot move an EQR and change it from/to prim. res. at the same time


/PLMI/AL_GSS_R2MR_SU081 - Overview

  • Message type: E = Error

  • Message class: /PLMI/AL_GSS_R2MR_SU -

  • Message number: 081

  • Message text: You cannot move an EQR and change it from/to prim. res. at the same time

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /PLMI/AL_GSS_R2MR_SU081 - You cannot move an EQR and change it from/to prim. res. at the same time ?
    The SAP error message /PLMI/AL_GSS_R2MR_SU081 indicates that there is an issue with moving an Equipment Resource (EQR) while simultaneously trying to change its primary resource. This error typically arises in the context of resource management within SAP, particularly in the areas of project management or production planning.
    
    Cause: The error occurs because the system does not allow the simultaneous movement of an EQR and a change to its primary resource. This is likely due to constraints in the system's logic that prevent conflicting operations from being executed at the same time. The primary resource is a key attribute of the EQR, and changing it while moving the EQR can lead to inconsistencies in resource allocation and planning.
    Solution: To resolve this error, you should follow these steps: Separate the Actions: Instead of trying to move the EQR and change its primary resource in a single transaction, perform these actions in two separate steps: First, move the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author