Message type: E = Error
Message class: /PLMI/AL_GSS_R2MR_SU -
Message number: 080
Message text: Control recipe destination has been changed to &1 for phase &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PLMI/AL_GSS_R2MR_SU080
- Control recipe destination has been changed to &1 for phase &2 ?The SAP error message /PLMI/AL_GSS_R2MR_SU080 indicates that the control recipe destination has been changed for a specific phase in a production process. This message typically arises in the context of process order management, particularly in industries that utilize SAP for manufacturing and production planning.
Cause: The error message is triggered when there is a change in the control recipe destination for a specific phase of a production order. This can happen due to various reasons, such as: Manual changes made to the control recipe or production order. Changes in the configuration of the production process. Issues with the master data related to the control recipe or the production order. System settings or parameters that dictate how control recipes are managed.
Solution: To resolve this issue, you can take the following steps: Check Control Recipe Settings: Review the control recipe settings in the system to ensure that they are correctly configured for the production order and its phases. Review Production Order: Check the
Get instant SAP help. Sign up for our Free Essentials Plan.
/PLMI/AL_GSS_R2MR_SU079
EQR &1 is no longer primary, EQR &2 has been changed to primary
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PLMI/AL_GSS_R2MR_SU078
Solve attribute-related conflicts before structural conflicts
What causes this issue? When you choose the <ZK>Apply Solutions</> button, the system checks if there are any remaining attribute-related...
/PLMI/AL_GSS_R2MR_SU081
You cannot move an EQR and change it from/to prim. res. at the same time
What causes this issue? You cannot move an <DS:GLOS.3DBC235C5ED22B4BA78166F9DD5BF489>equipment requirement</> and change it from or to &l...
/PLMI/AL_GSS_R2MR_SU082
When adjusting process instruction &1, the related PIs are also remapped
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.