How To Fix PLM_SE_PRS_MESSAGES082 - Acty elements cannot have ntwk relations or milestones.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PLM_SE_PRS_MESSAGES - Message class for PS services

  • Message number: 082

  • Message text: Acty elements cannot have ntwk relations or milestones.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PLM_SE_PRS_MESSAGES082 - Acty elements cannot have ntwk relations or milestones. ?

    The SAP error message PLM_SE_PRS_MESSAGES082 indicates that there is an issue with the project structure in the Project System (PS) module of SAP. Specifically, it states that "Activity elements cannot have network relations or milestones." This error typically arises when you attempt to assign network relationships or milestones to an activity element in a project that is not allowed.

    Cause:

    1. Incorrect Assignment: The error usually occurs when you try to create or modify a project activity that is not designed to have network relationships or milestones. In SAP, certain elements (like activities) are not meant to have dependencies or milestones associated with them.
    2. Project Structure Issues: The project structure may not be set up correctly, leading to attempts to create relationships that are not valid.
    3. Configuration Settings: There may be configuration settings in the project type or the project profile that restrict the use of network relationships or milestones for certain activity types.

    Solution:

    1. Review Activity Type: Check the type of activity you are trying to create or modify. Ensure that it is appropriate for the intended use. If it is an activity element, it should not have network relationships or milestones.
    2. Remove Invalid Relationships: If you have already assigned network relationships or milestones to the activity, you will need to remove them. Go to the project structure and delete any invalid relationships.
    3. Check Project Profile: Review the project profile and settings to ensure that they allow for the intended structure. You may need to adjust the configuration if certain elements are not behaving as expected.
    4. Use Correct Elements: If you need to create relationships or milestones, consider using the correct project elements that support these features, such as network activities or milestones themselves.
    5. Consult Documentation: Refer to SAP documentation or help resources for guidance on project structures and the specific limitations of activity elements.

    Related Information:

    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional context.
    • Project System Documentation: Review the SAP Project System documentation for best practices on structuring projects and understanding the relationships between different project elements.
    • Training and Support: If you are unsure about the project structure or how to resolve the issue, consider reaching out to your SAP support team or consulting with a professional who specializes in SAP Project System.

    By following these steps, you should be able to resolve the error and ensure that your project structure is set up correctly.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author