How To Fix PLM_SE_PRS_MESSAGES081 - WBS element ID &1 may not be used.


PLM_SE_PRS_MESSAGES081 - Overview

  • Message type: E = Error

  • Message class: PLM_SE_PRS_MESSAGES - Message class for PS services

  • Message number: 081

  • Message text: WBS element ID &1 may not be used.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PLM_SE_PRS_MESSAGES081 - WBS element ID &1 may not be used. ?
    The SAP error message PLM_SE_PRS_MESSAGES081 indicates that a Work Breakdown Structure (WBS) element ID cannot be used in the context you are trying to apply it. This error typically arises in project management scenarios within SAP, particularly when dealing with project structures, budgeting, or cost planning.
    
    Cause: The error can occur due to several reasons, including: WBS Element Status: The WBS element may be in a status that does not allow it to be used for the operation you are attempting (e.g., it might be locked, closed, or not released). Incorrect WBS Element: The WBS element ID you are trying to use may not exist or may have been deleted or archived. Hierarchy Issues: The WBS element may not be correctly positioned within the project hierarchy, or it may not be assigned to the correct project. Authorization Issues: The user may not have the necessary authorizations to access or use the specified WBS element. Project Definition Issues:

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author