How To Fix PLM_SE_PRS_MESSAGES077 - Parent network has to be the same for an acty and its acty element.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PLM_SE_PRS_MESSAGES - Message class for PS services

  • Message number: 077

  • Message text: Parent network has to be the same for an acty and its acty element.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PLM_SE_PRS_MESSAGES077 - Parent network has to be the same for an acty and its acty element. ?

    The SAP error message PLM_SE_PRS_MESSAGES077 indicates that there is a mismatch in the parent network for an activity and its associated activity element in a project or process. This typically occurs in the context of Project System (PS) or Product Lifecycle Management (PLM) modules when you are trying to create or modify activities and their relationships.

    Cause:

    The error arises when:

    • An activity (acty) is linked to an activity element (acty element) that belongs to a different parent network. In SAP, each activity and its elements must belong to the same network for proper hierarchy and relationship management.
    • There may be an attempt to assign an activity element to an activity that is not part of the same project or network structure.

    Solution:

    To resolve this error, you can take the following steps:

    1. Check Network Assignment:

      • Verify that both the activity and the activity element are assigned to the same parent network. You can do this by checking the network assignment in the project structure.
    2. Correct the Assignment:

      • If they are not assigned to the same network, you will need to either:
        • Change the activity element to belong to the correct network.
        • Or, if necessary, create a new activity that is part of the same network as the activity element.
    3. Review Project Structure:

      • Ensure that the overall project structure is correctly set up and that all elements are properly linked. This includes checking for any inconsistencies in the project hierarchy.
    4. Use Transaction Codes:

      • Use transaction codes like CJ20N (Project Builder) or CJ02 (Change Project) to review and modify the project structure and network assignments.
    5. Consult Documentation:

      • Refer to SAP documentation or help resources for more detailed guidance on managing networks and activities within the Project System or PLM modules.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N, CJ02, and others related to project management in SAP.
    • SAP Notes: Check for any SAP Notes related to this error message for additional insights or patches that may address specific issues.
    • User Roles and Permissions: Ensure that you have the necessary permissions to make changes to the project structure and network assignments.

    By following these steps, you should be able to resolve the error and ensure that your activities and their elements are correctly aligned within the same parent network.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant