How To Fix PLM_SE_PRS_MESSAGES076 - Parent WBS element has to be the same for an acty and its acty element.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PLM_SE_PRS_MESSAGES - Message class for PS services

  • Message number: 076

  • Message text: Parent WBS element has to be the same for an acty and its acty element.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PLM_SE_PRS_MESSAGES076 - Parent WBS element has to be the same for an acty and its acty element. ?

    The SAP error message PLM_SE_PRS_MESSAGES076 indicates that there is a mismatch in the Work Breakdown Structure (WBS) elements between an activity and its associated activity element in a project. This typically occurs in the context of project management within SAP, particularly when dealing with project planning and scheduling.

    Cause:

    The error arises when:

    • An activity (e.g., a task or work package) is assigned to a different WBS element than its corresponding activity element (e.g., a sub-task or component).
    • The system requires that both the activity and its activity element share the same parent WBS element to maintain the integrity of the project structure.

    Solution:

    To resolve this error, you can take the following steps:

    1. Check WBS Elements:

      • Review the WBS elements assigned to both the activity and its activity element. Ensure that they are indeed the same.
      • You can do this by navigating to the project structure in SAP and examining the details of the activity and its associated elements.
    2. Adjust WBS Assignment:

      • If you find that the WBS elements are different, you will need to adjust the assignment of either the activity or the activity element so that they both point to the same parent WBS element.
      • This can typically be done in the project planning transaction (e.g., CJ20N or CJ02) by editing the relevant fields.
    3. Recreate Activity/Element:

      • If the adjustments are complex or if the structure is significantly incorrect, consider deleting the problematic activity or activity element and recreating it with the correct WBS assignment.
    4. Consult Documentation:

      • Refer to SAP documentation or help resources for specific instructions on managing WBS elements and activities, as the exact steps may vary based on your SAP version and configuration.
    5. Check Authorizations:

      • Ensure that you have the necessary authorizations to make changes to the project structure. Lack of permissions can sometimes lead to confusion when trying to resolve such issues.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder), CJ02 (Change Project), and CJ03 (Display Project) for managing project structures.
    • SAP Notes: Check for any SAP Notes related to this error message for additional insights or patches that may address known issues.
    • Training and Support: If you continue to face issues, consider reaching out to your SAP support team or consulting with a colleague who has experience in project management within SAP.

    By following these steps, you should be able to resolve the error and ensure that your project structure is correctly aligned.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author