How To Fix PLM_SE_PRS_MESSAGES036 - The action on milestone &1 could not be performed.


PLM_SE_PRS_MESSAGES036 - Overview

  • Message type: E = Error

  • Message class: PLM_SE_PRS_MESSAGES - Message class for PS services

  • Message number: 036

  • Message text: The action on milestone &1 could not be performed.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PLM_SE_PRS_MESSAGES036 - The action on milestone &1 could not be performed. ?
    The SAP error message PLM_SE_PRS_MESSAGES036, which states "The action on milestone &1 could not be performed," typically occurs in the context of Project Management or Product Lifecycle Management (PLM) when there is an issue with processing a milestone in a project.
    Possible Causes:
    
    Milestone Status: The milestone may be in a status that does not allow the action you are trying to perform (e.g., it may be locked or completed).
    Authorization Issues: The user may not have the necessary authorizations to perform the action on the milestone.
    Dependencies: There may be dependencies or prerequisites that have not been met for the milestone.
    System Configuration: There could be configuration issues in the project or PLM settings that prevent the action from being executed.
    Data Integrity: There may be inconsistencies or missing data related to the milestone that need to be resolved.
    
    Solutions:
    
    Check Milestone Status: Verify the current status of the milestone. If it is locked or completed, you

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant