Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: PLM_AUDIT_APPL - Audit Application
Message number: 021
Message text: Graphical time scheduling could not be started
A problem arose while calling graphical time scheduling. This problem
was probably caused by one of the following:
Microsoft Project is not installed correctly on your PC.
The audit plan that you have selected is open in display mode.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Check if the audit plan that you have selected is open in display mode
and, if necessary, switch to the change mode.
Check that Microsoft Project '98 or MS Project 2000 is installed
correctly on your PC.
Check that the SAPGui component CRM-ADDON is installed correctly.
Error message extract from SAP system. Copyright SAP SE.
PLM_AUDIT_APPL021
- Graphical time scheduling could not be started ?The SAP error message PLM_AUDIT_APPL021 indicates that the graphical time scheduling function could not be started. This error typically occurs in the context of SAP Project System (PS) or SAP Product Lifecycle Management (PLM) when there are issues related to the scheduling of tasks or activities.
Possible Causes:
- Missing Authorizations: The user may not have the necessary authorizations to access the graphical scheduling tool.
- Configuration Issues: There may be configuration problems in the project or the system that prevent the graphical scheduling from being initiated.
- System Errors: There could be underlying system errors or inconsistencies in the database that are causing the scheduling tool to fail.
- Missing or Incorrect Data: Required data for the scheduling process may be missing or incorrectly configured, such as project definitions, work breakdown structures (WBS), or activity details.
- Technical Issues: There may be technical issues with the SAP GUI or the backend system that are preventing the graphical interface from loading.
Solutions:
- Check Authorizations: Ensure that the user has the necessary authorizations to access the graphical scheduling tool. This can be done by checking the user roles and authorizations in the SAP system.
- Review Configuration: Verify the configuration settings for the project or the scheduling tool. Ensure that all necessary parameters are correctly set up.
- Check for System Errors: Look for any system logs or error messages that might provide more context about the issue. Use transaction codes like SLG1 (Application Log) to check for relevant logs.
- Validate Data: Ensure that all required data for the project is complete and correctly configured. Check the project structure, WBS elements, and activities for any missing or incorrect entries.
- Technical Support: If the issue persists, consider reaching out to your SAP Basis or technical support team to investigate any underlying system issues or to check for patches or updates that may resolve the problem.
Related Information:
CJ20N
(Project Builder) or CATS
(Cross-Application Time Sheet) for managing projects and activities.By following these steps, you should be able to identify and resolve the issue causing the PLM_AUDIT_APPL021 error. If the problem continues, consider escalating the issue to SAP support for further assistance.
Get instant SAP help. Sign up for our Free Essentials Plan.
PLM_AUDIT_APPL020
File was exported with the assigned audit components
What causes this issue? The Microsoft Project file you have selected was exported with the option "With Assigned Audit Components". A file ...
PLM_AUDIT_APPL019
Import was successful
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PLM_AUDIT_APPL022
The selected audit component & is not an audit
What causes this issue? You have entered an audit. However, '&V1&' is not an audit.System Response The system issues an error mess...
PLM_AUDIT_APPL023
The selected audit component & is not a corrective/preventive action
What causes this issue? You have entered a corrective/preventive action. However, '&V1&' is not a corrective/preventive action.Syst...
Click on this link to search all SAP messages.