How To Fix PK1009 -


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PK1 - Proudction - Kanban - BI Analytics

  • Message number: 009

  • Message text:

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PK1009 - ?

    The SAP error message PK1009 typically indicates an issue related to the production planning process, specifically concerning the availability of materials or resources for production orders. The error message can arise in various contexts, such as during the creation of production orders, scheduling, or when trying to confirm production activities.

    Cause:

    The PK1009 error message usually occurs due to one or more of the following reasons:

    1. Material Shortage: The required materials for the production order are not available in sufficient quantities.
    2. Capacity Constraints: The work center or production line may not have enough capacity to handle the production order.
    3. Incorrect Master Data: There may be issues with the material master, BOM (Bill of Materials), or routing data.
    4. Scheduling Conflicts: There may be conflicts in the scheduling of production orders, leading to resource unavailability.

    Solution:

    To resolve the PK1009 error, you can take the following steps:

    1. Check Material Availability:

      • Use transaction code MD04 (Stock/Requirements List) to check the availability of the required materials.
      • Ensure that the materials are available in the required quantities and that there are no outstanding purchase orders or production orders that could affect availability.
    2. Review Production Order Details:

      • Check the production order for any discrepancies in the BOM or routing.
      • Ensure that the production order is correctly configured and that all necessary components are included.
    3. Analyze Capacity:

      • Use transaction code CM01 (Capacity Planning) to check the capacity of the work centers involved.
      • If there are capacity constraints, consider rescheduling the production order or adjusting the capacity of the work center.
    4. Adjust Scheduling:

      • Review the scheduling parameters for the production order. Ensure that the start and finish dates are realistic and that there are no overlaps with other orders.
    5. Consult with Master Data:

      • If there are issues with the master data, consult with the relevant team to ensure that the material master, BOM, and routing are correctly set up.
    6. Error Logs:

      • Check the error logs for more detailed information about the error. This can provide insights into what specifically is causing the issue.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as MD04 (Stock/Requirements List), CO01 (Create Production Order), and CM01 (Capacity Planning).
    • SAP Notes: Check SAP Notes for any known issues or patches related to the PK1009 error.
    • Documentation: Review SAP documentation or help files related to production planning and order management for additional context and troubleshooting steps.

    If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:
  • PK1008 
    Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...

  • PK1007 & document item(s) initialized
    Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...

  • PK1010 TagID is not available
    Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...

  • PK1011 Auto-ID system is not connected
    Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant