How To Fix PK633 - Control Cycles without destination bin exist for this repl. strategy


PK633 - Overview

  • Message type: E = Error

  • Message class: PK - Production - KANBAN

  • Message number: 633

  • Message text: Control Cycles without destination bin exist for this repl. strategy

  • Show details Hide details
  • What causes this issue?

    Control Cycles without destination bin exist for this replenishment
    strategy.
    You are not allowed to set the indicator to post goods movements
    synchronously without maintaining a destination bin in the corresponding
    Control Cycle.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    You can identify and change Control Cycles in the "Manage Kanban Control
    Cycle" screen:
    enter your plant in the left upper corner, open the "Extended
    Selection", navigate to section "Kanban Control Cycles: Delimitations",
    sub section "Replenishment Strategy Delimitations" and in the field
    "External Procurement" use the F4 help to pick your replenishment
    strategy. After executing the search affected Control Cycles will be
    listed.
    You can now check and correct your Control Cycles.

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PK633 - Control Cycles without destination bin exist for this repl. strategy ?
    The SAP error message PK633 indicates that there are control cycles without a destination bin for a specific replenishment strategy. This typically occurs in the context of inventory management and production planning, particularly when dealing with control cycles in a warehouse management system (WMS) or in the context of materials management.
    
    Cause: Missing Destination Bin: The control cycle is defined for a material, but the destination bin where the material should be replenished is not specified. Incorrect Configuration: The replenishment strategy may not be properly configured, leading to the system not being able to determine where to place the stock. Control Cycle Definition: The control cycle itself may not be fully defined or may have been set up incorrectly, lacking necessary parameters. Material Master Data Issues: The material master data may not have the required settings for the replenishment strategy being used.
    Solution: Check Control Cycle Configuration: Go to the control cycle configuration in SAP and ensure that

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author