Message type: E = Error
Message class: PK - Production - KANBAN
Message number: 546
Message text: Replen. lead time [h:min] requires factory calendar and shift sequence
You have maintained a replenishment lead time in hours and minutes in
the control cycle. If this time is to be used to calculate the control
cycle, you must maintain the exact working time of the consumer (demand
source) in a factory calendar or shift sequence and then enter this
calendar or consumer's shift sequence in a calculation profile or the
production supply area (PSA). You must then assign the calculation
profile or the PSA to this control cycle.
You have not specified a factory calendar or shift sequence for the
consumer in either the PSA or the calculation profile.
The system issues this error message.
Check the calculation profile or the PSA. You can display the
calculation profile and PSA entered in the control cycle.
Enter the factory calendar and shift sequence for either the consumer
(demand source) or the supply source in the calculation profile. Or
enter the factory calendar and shift sequence for the consumer in the
PSA.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
PK546
- Replen. lead time [h:min] requires factory calendar and shift sequence ?The SAP error message PK546 indicates that there is an issue with the replenishment lead time configuration in the system. Specifically, it suggests that the system requires a factory calendar and shift sequence to properly calculate the replenishment lead time in hours and minutes.
Cause: Missing Factory Calendar: The factory calendar defines the working days and hours for a specific plant or storage location. If this is not set up correctly, the system cannot determine the available working time for replenishment. Missing Shift Sequence: The shift sequence defines the working shifts for the employees in a plant. If the shift sequence is not defined, the system cannot calculate the lead time based on the shifts.
Configuration Issues: There may be issues in the configuration of the material master or the planning parameters that are causing the system to not recognize the factory calendar or shift sequence.
Solution: Check Factory Calendar: Go to the transaction code SCAL (Factory
Get instant SAP help. Sign up for our Free Essentials Plan.
PK545
Control cycle &1 for material &2, plant &3, and PSA &4 inconsistent
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PK544
Error generating timestream
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PK547
Pull interval [h:m] requires factory calendar and shift sequence
What causes this issue? You have maintained a pull interval in hours and minutes in the control cycle. If this time is to be used to calculate the co...
PK548
Pull interval [h:m] requires factory calendar and shift sequence
What causes this issue? You have maintained a pull interval in hours and minutes in the production supply area. You have not specified a factory cale...