Do you have any question about this error?
Message type: E = Error
Message class: PK - Production - KANBAN
Message number: 512
Message text: Control cycle category "L" not allowed for WM PP (WMS) control cycle
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PK512
- Control cycle category "L" not allowed for WM PP (WMS) control cycle ?The SAP error message PK512 indicates that there is an issue with the control cycle category "L" (which typically refers to a specific type of control cycle) not being allowed for WM PP (Warehouse Management Production Planning) control cycles. This error usually arises in the context of production planning and warehouse management integration.
Cause:
- Control Cycle Configuration: The control cycle category "L" may not be configured correctly in the system for the specific warehouse management (WM) and production planning (PP) integration. This could be due to incorrect settings in the control cycle definition.
- Incompatibility: The control cycle category "L" might not be compatible with the WM PP processes you are trying to execute. This could be due to the nature of the control cycle or the specific requirements of the WM and PP integration.
- Master Data Issues: There may be issues with the master data related to the materials, storage locations, or other relevant entities that are involved in the control cycle.
Solution:
Check Control Cycle Configuration:
- Go to the configuration settings for control cycles in SAP (Transaction code:
OMI4
or similar).- Verify that the control cycle category "L" is correctly defined and that it is allowed for the WM PP processes you are using.
- If necessary, adjust the configuration to allow the use of category "L" for the relevant control cycles.
Review Master Data:
- Ensure that all relevant master data (materials, storage locations, etc.) is correctly set up and compatible with the control cycle you are trying to use.
- Check if the material is set up for WM and PP processes and that it has the necessary views activated.
Consult Documentation:
- Review SAP documentation or help resources related to control cycles, WM, and PP integration to understand the specific requirements and limitations of control cycle categories.
Testing:
- After making any changes, perform tests to ensure that the error no longer occurs and that the control cycle functions as expected.
Seek Support:
- If the issue persists, consider reaching out to your SAP support team or consulting with an SAP expert who can provide more detailed assistance based on your specific system configuration and requirements.
Related Information:
By following these steps, you should be able to identify the root cause of the PK512 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
PK511
Reporting point confirmation not allowed for this replenishment strategy
What causes this issue? You have set the <ZK>Reporting Point Confirmation with Kanban</> indicator in the repetitive manufacturing profil...
PK510
Reporting point information missing
What causes this issue? You have not entered a <DS:GLOS.3526C41CAFAB52B9E10000009B38F974>reporting point</> in the control cycle, althoug...
PK513
No selection for kanban status 'FULL' or 'IN USE'
What causes this issue? You wish to display delayed replenishment elements for kanban containers with the status 'FULL' or 'IN USE...
PK514
Data locked; switch to display mode
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.