Do you have any question about this error?
Message type: E = Error
Message class: PK - Production - KANBAN
Message number: 510
Message text: Reporting point information missing
You have not entered a
<DS:GLOS.3526C41CAFAB52B9E10000009B38F974>reporting point</> in the
control cycle, although you have specified a replenishment strategy with
reporting point confirmation.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
If you specify a replenishment strategy with in-house production and
reporting point confirmation in a control cycle, you must enter a
reporting point in the control cycle.
Error message extract from SAP system. Copyright SAP SE.
PK510
- Reporting point information missing ?The SAP error message PK510, which states "Reporting point information missing," typically occurs in the context of production planning and control (PP) or related modules when the system cannot find the necessary reporting point data for a specific operation or process. This can happen in various scenarios, such as during the creation of production orders, confirmations, or when trying to execute certain transactions.
Causes of PK510 Error
Missing Reporting Point Data: The most common cause is that the reporting point data has not been maintained for the relevant material or operation in the routing or production order.
Incorrect Configuration: There may be issues with the configuration of the production process, such as missing settings in the routing or work center.
Data Inconsistencies: There could be inconsistencies in the master data, such as the material master, routing, or work center.
Authorization Issues: Sometimes, the user may not have the necessary authorizations to access the reporting point data.
Solutions to PK510 Error
Check Routing and Work Center:
- Go to the routing associated with the production order and ensure that the reporting point data is correctly maintained.
- Verify that the work center used in the routing has the necessary reporting point information.
Maintain Reporting Points:
- If reporting points are missing, you can maintain them in the routing or work center. This can usually be done in transaction codes like CA01 (Create Routing) or CA02 (Change Routing).
Review Production Order:
- Check the production order for any inconsistencies. You can use transaction code CO02 to display and modify the production order.
Check Master Data:
- Ensure that the material master and other related master data are correctly set up. Use transaction codes like MM03 (Display Material) to check the material master.
Authorization Check:
- Ensure that the user has the necessary authorizations to access and modify the relevant data. This may require coordination with your SAP security team.
Consult Documentation:
- Review SAP documentation or help files related to production planning and reporting points for additional guidance.
Related Information
By following these steps, you should be able to identify the cause of the PK510 error and implement the necessary solutions to resolve it.
Get instant SAP help. Start your 7-day free trial now.
PK509
No work centers found in plant &1 for selection option
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PK508
Work center &1 does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PK511
Reporting point confirmation not allowed for this replenishment strategy
What causes this issue? You have set the <ZK>Reporting Point Confirmation with Kanban</> indicator in the repetitive manufacturing profil...
PK512
Control cycle category "L" not allowed for WM PP (WMS) control cycle
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.