Message type: E = Error
Message class: PK - Production - KANBAN
Message number: 299
Message text: The kanban calculation is not provided for control cycle &1
This control cycle is not provided for the calculation. The calculation
type '1' or '2' has not been maintained in either the control cylce or
in the calculation profile that you may have specified.
Error message extract from SAP system. Copyright SAP SE.
PK299
- The kanban calculation is not provided for control cycle &1 ?The SAP error message PK299, which states "The kanban calculation is not provided for control cycle &1," typically occurs in the context of Kanban processing within SAP's Production Planning (PP) module. This error indicates that the system is unable to find the necessary configuration or data for the specified control cycle, which is essential for the Kanban calculation to proceed.
Cause: Missing Control Cycle Configuration: The control cycle for the specified Kanban board may not be properly configured or may be missing entirely. Incorrect Control Cycle Assignment: The control cycle might not be assigned to the relevant material or production process. Inactive Control Cycle: The control cycle could be inactive or not set up correctly in the system. Data Inconsistencies: There may be inconsistencies in the master data related to the Kanban setup, such as material master or work center data.
Solution: Check Control Cycle Configuration: Navigate to the transaction code PK01 (Create Control Cycle) or PK02 (Change
Get instant SAP help. Sign up for our Free Essentials Plan.
PK298
The status of kanban container &1 will be reset
What causes this issue? You are carrying out a reversal for a backflush in Repetitive Manufacturing. This backflush was created with reference to a k...
PK297
The status of kanban container &1 will not be reset
What causes this issue? You are carrying out a reversal for a backflush in Repetitive Manufacturing. This backflush was created with reference to a k...
PK300
Insufficient Customizing 'Adjusting a control cycle...' for plant &1
What causes this issue? The Customizing point 'Adjusting a control cycle in the kanban calculation' has not been sufficiently maintained. A...
PK301
Enter a kanban quantity greater than zero
What causes this issue? You have selected a replenishment strategy for which the packing instruction is only used as additional data in the control c...
Click on this link to search all SAP messages.