Message type: E = Error
Message class: PK - Production - KANBAN
Message number: 141
Message text: No fixed lot size in mat. master record or differs from kanban quantity
You have specified in Customizing for the replenishment strategies for
in-house production that no new planned order is to be created when a
kanban container is set to "Empty". Instead, a planned order generated
via the MRP run is to be used.
However, this is possible only if the kanban quantity and the fixed lot
size in the material master record are the same.
Either you have not specified a fixed lot size in the material master
record (MRP 1 view) or the lot size differs from the kanban quantity.
In this case, the planned orders of MRP cannot be used for Kanban.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Use the same lot size for the kanban quantity and for the material.
Change the kanban quantity in the control cycle or adjust the fixed lot
size in the material master record to the kanban quantity.
Also check whether the use of planned orders from the MRP run makes
sense for empty kanban containers.
Error message extract from SAP system. Copyright SAP SE.
PK141
- No fixed lot size in mat. master record or differs from kanban quantity ?The SAP error message PK141 indicates that there is an issue with the lot size configuration in the material master record for a specific material when working with Kanban. This error typically arises in the context of Kanban processing, where the system expects a fixed lot size that matches the Kanban quantity defined for the material.
Cause: No Fixed Lot Size Defined: The material master record does not have a fixed lot size defined in the relevant views (usually the MRP or Purchasing views). Mismatch in Lot Size and Kanban Quantity: The fixed lot size defined in the material master does not match the Kanban quantity that has been set up for the Kanban control cycle.
Configuration Issues: There may be issues with the configuration of the Kanban settings in the system, leading to discrepancies between the expected and actual values.
Solution: Check Material Master Record: Go to the material master record (transaction code MM02). Check the MRP
Get instant SAP help. Sign up for our Free Essentials Plan.
PK140
Assignment of indep. source not poss. in case of event-driven cntrl cycle
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PK139
Enter a purchasing organization
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PK142
Kanban container must not be deleted
What causes this issue? You want to delete a kanban container that does not have the status "waiting".System Response This is not possible...
PK143
Not possible to cancel (Inbound delivery & must be cancelled first)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.