Do you have any question about this error?
Message type: E = Error
Message class: PJ - MPX interface messages (Download and Upload)
Message number: 140
Message text: Profile & does not exist
Standard network profile &V1& does not exist.
INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJECT DOKU ID TX
Check whether you have entered the correct key for the standard network
profile. Make any necessary changes.
Error message extract from SAP system. Copyright SAP SE.
PJ140
- Profile & does not exist ?The SAP error message PJ140, which states "Profile & does not exist," typically occurs in the context of Project System (PS) module when the system is unable to find a specific profile that is required for a particular operation, such as creating or managing projects.
Cause:
- Missing Profile: The specified profile does not exist in the system. This could be due to a configuration issue or because the profile was deleted or not created.
- Incorrect Profile Assignment: The profile may be incorrectly assigned in the project settings or in the transaction you are trying to execute.
- Authorization Issues: The user may not have the necessary authorizations to access the profile.
- Transport Issues: If the profile was recently transported from another system, it may not have been included in the transport request.
Solution:
Check Profile Existence:
- Go to the relevant configuration transaction (e.g., OPRD for project profiles) and verify if the profile exists.
- If it does not exist, you may need to create it or restore it from a backup.
Create or Modify Profile:
- If the profile is missing, you can create a new profile using the appropriate configuration transaction.
- Ensure that all necessary parameters and settings are correctly defined.
Verify Profile Assignment:
- Check the project or transaction settings to ensure that the correct profile is assigned.
- Make sure that the profile name is spelled correctly and matches the expected format.
Check Authorizations:
- Ensure that the user has the necessary authorizations to access the profile. This may involve checking user roles and permissions.
Transport Check:
- If the profile was supposed to be transported from another system, check the transport logs to ensure it was included and successfully imported.
Consult Documentation:
- Refer to SAP documentation or help resources for specific guidance on the profile in question.
Related Information:
OPRJ
(Project Profile) or OPR1
(Project Profile: Create) to manage project profiles.By following these steps, you should be able to identify the cause of the PJ140 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
PJ130
Error when writing PC file (Please check PC)
What causes this issue? While creating a MPX file, a PC error occurred.System Response INCLUDE 'NA_ALLG_NOFUNKTION' OBJECT DOKU ID TXHow t...
PJ120
PC line too long: "& ...&" (longer than & characters)
What causes this issue? While creating the MPX file, lines grew too large to be downloaded or uploaded. The maximum line length for a download/upload...
PJ150
W: The PC filename was changed (Please confirm)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PJ160
Standard network & & downloaded to file &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.