Message type: E = Error
Message class: PFM_EA_PS -
Message number: 060
Message text: Operational program &1 and manager &2 are not valid between &3 and &4
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PFM_EA_PS060
- Operational program &1 and manager &2 are not valid between &3 and &4 ?The SAP error message PFM_EA_PS060 indicates that there is an issue with the operational program and manager assignment in the context of project management or financial management. Specifically, the error states that the operational program and manager specified are not valid for the given date range.
Cause: Invalid Program/Manager Assignment: The operational program (&1) and manager (&2) combination is not valid for the specified period (&3 to &4). This could be due to: The operational program or manager being inactive or not assigned during the specified dates. The operational program or manager being incorrectly configured in the system. The dates provided do not align with the validity period of the operational program or manager. Date Range Issues: The date range specified may not correspond to the active periods of the operational program or manager.
Solution: Check Validity Period: Verify the validity period of the operational program and manager in the system. Ensure that both are active during the specified
Get instant SAP help. Sign up for our Free Essentials Plan.
PFM_EA_PS056
Period not valid. Please enter a period between 1 and 12.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PFM_EA_PS055
The Project &1 has one or more Subproj. assigned. Please enter Subproj.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PFM_EA_PS061
Project/Subproject &1/&2 are not valid in the period between &3 and &4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PFM_EA_PS066
Incorrect customizing for GL Account &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.