Do you have any question about this error?
Message type: E = Error
Message class: /PF1/PE_PP -
Message number: 601
Message text: &1 &2 &3 &4
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PF1/PE_PP601
- &1 &2 &3 &4 ?The SAP error message
/PF1/PE_PP601 &1 &2 &3 &4
typically relates to issues in the Production Planning (PP) module, particularly concerning the planning and execution of production orders. The specific details of the error message can vary based on the parameters&1
,&2
,&3
, and&4
, which usually provide additional context about the error.Possible Causes:
- Missing Master Data: The error may occur if there are missing or incorrect master data records, such as material master, bill of materials (BOM), or routing information.
- Capacity Issues: The error could be related to capacity planning, where the system cannot allocate resources due to insufficient capacity or conflicting schedules.
- Incorrect Configuration: Configuration settings in the PP module may not be set up correctly, leading to issues in production planning.
- Order Status: The production order may be in a status that does not allow for the requested operation (e.g., if it is already completed or canceled).
- Data Inconsistencies: There may be inconsistencies in the data that the system is trying to process, such as invalid dates or quantities.
Solutions:
- Check Master Data: Verify that all necessary master data (material, BOM, routing) is correctly set up and complete. Ensure that the relevant records exist and are active.
- Review Capacity Planning: Check the capacity planning settings and ensure that there are sufficient resources available for the production order. Adjust the capacity or reschedule the order if necessary.
- Configuration Review: Review the configuration settings in the PP module to ensure they align with business processes and requirements.
- Order Status Check: Check the status of the production order. If it is not in a valid status for the operation you are trying to perform, you may need to change the status or create a new order.
- Data Validation: Validate the data being processed for any inconsistencies or errors. Correct any invalid entries.
Related Information:
CO02
(Change Production Order), MD04
(Stock/Requirements List), or C223
(Change BOM) to investigate and resolve the issue.If you have specific values for &1
, &2
, &3
, and &4
, it would be helpful to analyze those to provide more targeted assistance.
Get instant SAP help. Start your 7-day free trial now.
/PF1/PE_PP503
No Tasks available for parallel execution.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PF1/PE_PP502
Synchronization with level 2 in &1 lost - packages lost.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PF1/PE_PP602
Package &1 started: &2 ended: &3 Overall runtime: &4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PF1/PE_PP603
Processed at Lvl1: &1 at Lvl2: &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.