How To Fix /PF1/PE_PP149 - Integration of settlement


/PF1/PE_PP149 - Overview

  • Message type: E = Error

  • Message class: /PF1/PE_PP -

  • Message number: 149

  • Message text: Integration of settlement

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/PF1/PE_PP149 - Details

  • The SAP error message /PF1/PE_PP149 typically relates to issues in the integration of settlement processes, particularly in the context of Production Planning (PP) and Controlling (CO) modules. This error can occur during the settlement of production orders or internal orders, indicating that there is a problem with the integration of data between these modules.
    Possible Causes:
    
    Missing or Incorrect Master Data: The error may arise if there are missing or incorrect master data records, such as cost centers, internal orders, or production resources.
    
    Configuration Issues: Incorrect configuration settings in the controlling area or production order settings can lead to this error. Settlement Profile Issues: The settlement profile assigned to the order may not be correctly set up or may not match the requirements for the settlement process. Data Inconsistencies: Inconsistencies in the data related to the production order or internal order can also trigger this error. Authorization Issues: Lack of proper authorizations for the user trying

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/PF1/PE_PP149 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker