Message type: E = Error
Message class: /PF1/PE_PP -
Message number: 132
Message text: Not yet maintained
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PF1/PE_PP132
- Not yet maintained ?The SAP error message /PF1/PE_PP132 Not yet maintained typically indicates that a certain configuration or data entry is missing in the system, which is required for the process you are trying to execute. This error is often related to the Production Planning (PP) module in SAP.
Cause: Missing Master Data: The error may arise if the necessary master data (like Material Master, Bill of Materials, or Routing) has not been maintained for the specific material or production order you are working with.
Configuration Issues: There may be configuration settings in the system that have not been set up correctly or are incomplete. Missing Parameters: Certain parameters or settings that are required for the process (like work centers, production versions, etc.) may not have been defined.
Solution: Check Master Data: Ensure that the Material Master is created and contains all necessary views (like MRP, Work Scheduling). Verify that the Bill of Materials (BOM) and Routing are correctly maintained for
Get instant SAP help. Sign up for our Free Essentials Plan.
/PF1/PE_PP131
Maintained
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PF1/PE_PP122
Endless loop in packages
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PF1/PE_PP144
Balance confirmation
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PF1/PE_PP147
First define the output device
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.