How To Fix PEP032 - Enter a factory calendar


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PEP - Schedule Manager: Messages

  • Message number: 032

  • Message text: Enter a factory calendar

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PEP032 - Enter a factory calendar ?

    The SAP error message PEP032, which states "Enter a factory calendar," typically occurs in the context of project management or production planning within SAP. This error indicates that a factory calendar has not been specified for a particular project or production order, which is necessary for scheduling and planning purposes.

    Cause:

    1. Missing Factory Calendar: The most common cause of this error is that the factory calendar has not been assigned to the project or production order.
    2. Incorrect Configuration: The factory calendar may not be properly configured in the system, or the relevant settings may not be correctly assigned to the project or order type.
    3. User Input Error: The user may have overlooked entering the factory calendar when creating or modifying the project or order.

    Solution:

    To resolve the PEP032 error, you can follow these steps:

    1. Assign a Factory Calendar:

      • Navigate to the project or production order where the error occurred.
      • Look for the field where the factory calendar can be entered (this is usually found in the project definition or order details).
      • Enter the appropriate factory calendar that corresponds to the working days and hours for the relevant plant or project.
    2. Check Configuration:

      • Ensure that the factory calendar is correctly configured in the system. You can do this by going to the configuration settings in SAP (transaction code SPRO).
      • Navigate to the relevant section for defining factory calendars and verify that the calendar is set up correctly.
    3. Review Project/Order Type Settings:

      • Check if the project or order type has a default factory calendar assigned. If not, you may need to assign one in the configuration settings.
    4. Consult Documentation:

      • If you are unsure about which factory calendar to use, consult your organization's documentation or speak with a project manager or SAP consultant who can provide guidance.
    5. User Training:

      • Ensure that users are trained on the importance of entering a factory calendar when creating projects or production orders to prevent this error in the future.

    Related Information:

    • Factory Calendar: A factory calendar defines the working days and hours for a specific plant or project. It is essential for scheduling tasks, determining lead times, and managing resources effectively.
    • Transaction Codes: Familiarize yourself with relevant transaction codes such as:
      • CJ20N: Project Builder
      • CO01: Create Production Order
      • SPRO: Customizing Implementation Guide
    • SAP Help Documentation: Refer to SAP's official help documentation for more detailed information on factory calendars and their configuration.

    By following these steps, you should be able to resolve the PEP032 error and ensure that your projects and production orders are properly scheduled.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant