Do you have any question about this error?
Message type: E = Error
Message class: PCA - Message Class for Production Campaign
Message number: 038
Message text: Enter a basic end date
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PCA038
- Enter a basic end date ?The SAP error message PCA038 "Enter a basic end date" typically occurs in the context of project management or controlling modules, particularly when dealing with planning or scheduling activities. This error indicates that a required field for a basic end date has not been filled in, which is necessary for the system to process the data correctly.
Cause:
- Missing Data: The basic end date field is mandatory for certain transactions or entries, and if it is left blank, the system will trigger this error.
- Incorrect Configuration: There may be configuration settings in the project or controlling module that require a basic end date to be specified.
- User Input Error: The user may have overlooked entering the basic end date while creating or modifying a project or planning entry.
Solution:
- Enter the Basic End Date: Navigate to the relevant transaction or screen where the error occurred and ensure that you fill in the basic end date field. This date typically represents the planned completion date of a project or task.
- Check Configuration Settings: If you are consistently encountering this error, review the configuration settings in the project management or controlling module to ensure that the basic end date is set up correctly.
- Validation of Data Entry: Ensure that all required fields are filled out correctly before saving or processing the transaction. This may involve reviewing the entire form or entry for any other missing mandatory fields.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the transaction you are working with, as there may be additional requirements or steps needed.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant for further assistance.
Get instant SAP help. Start your 7-day free trial now.
PCA037
A number range was not maintained for the internal number assignment
INCLUDE PCA036 OBJECT DOKU ID NA LANGUAGE ENError message extract from SAP system. Copyright SAP SE. ...
PCA036
A number range was not maintained for the production campaign
What causes this issue? A prerequisite for using the production campaign is that at least one number range is defined.System Response The system iss...
PCA039
The takt unit was changed in &
What causes this issue? You have changed the unit for the takt time. When you create a production campaign, the takt time is taken from the material ...
PCA040
Production campaign & was deleted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.