How To Fix PAMS164 - No meter maintained for the determination of activity-specific costs


PAMS164 - Overview

  • Message type: E = Error

  • Message class: PAMS - Messages for Graphical Planning Board

  • Message number: 164

  • Message text: No meter maintained for the determination of activity-specific costs

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PAMS164 - No meter maintained for the determination of activity-specific costs ?
    The SAP error message PAMS164, which states "No meter maintained for the determination of activity-specific costs," typically occurs in the context of Activity-Based Costing (ABC) or when dealing with cost centers and internal orders in SAP. This error indicates that the system cannot find a meter (or measurement) that is necessary for calculating activity-specific costs.
    
    Cause: Missing Meter Configuration: The primary cause of this error is that there is no meter defined for the activity type or cost center that is being used in the transaction. Meters are essential for measuring the consumption of resources or activities. Incorrect Activity Type Assignment: The activity type may not be correctly assigned to the cost center or internal order. Inconsistent Master Data: There may be inconsistencies or missing data in the master data related to the cost center, activity type, or the relevant configuration settings.
    Solution: Check Meter Configuration: Go to the configuration settings for the relevant activity type or

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant