Message type: E = Error
Message class: P5 - Project Information System: (Modification of LIS; M5)
Message number: 012
Message text: Project planning board & does not exist
The profile for project planning board &V1& does not exist. This means
you cannot access the graphic.
INCLUDE 'NA_ALLG_NOFUNKTION' OBJECT DOKU ID TX
INCLUDE 'NA_ALLG_VORGEHEN' OBJECT DOKU ID TX
Check whether the desired key is defined. If necessary, verify that the
profile for the project planning board has been created in Customizing.
Error message extract from SAP system. Copyright SAP SE.
P5012
- Project planning board & does not exist ?The SAP error message P5012 typically indicates that the project planning board you are trying to access does not exist or is not properly configured. This error can occur in the context of project management within SAP, particularly when dealing with project structures and planning boards.
Cause:
- Non-existent Planning Board: The specified project planning board has not been created or does not exist in the system.
- Incorrect Configuration: The planning board may not be configured correctly, or the user may not have the necessary authorizations to access it.
- Project Structure Issues: The project or WBS (Work Breakdown Structure) element you are trying to access may not be linked to the planning board.
- Data Consistency Issues: There may be inconsistencies in the data or settings related to the project planning board.
Solution:
Check Planning Board Existence:
- Verify that the planning board you are trying to access has been created. You can do this by navigating to the relevant transaction (e.g., CJ20N for project management) and checking the available planning boards.
Create or Configure Planning Board:
- If the planning board does not exist, you may need to create it. This can typically be done in the project management settings or through the relevant configuration transactions.
- Ensure that the planning board is properly configured to include the necessary project elements.
Authorization Check:
- Ensure that your user profile has the necessary authorizations to access the planning board. You may need to contact your SAP security administrator to verify and adjust your permissions.
Link Project to Planning Board:
- Make sure that the project or WBS element you are trying to access is linked to the planning board. You may need to adjust the project structure or settings to ensure proper linkage.
Data Consistency Check:
- Run any necessary consistency checks or reports to identify and resolve data issues related to the project planning board.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth assistance.
Get instant SAP help. Start your 7-day free trial now.
P5011
Field &-& not defined.
What causes this issue? No entry for key figure in table TMC73System Response The system issues an error message and will not allow you to continue ...
P5010
Enter column width between & and &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
P5013
Project profile not entered
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
P5014
Less that 2 numerical fields selected
What causes this issue? You are attempting to display the portfolio graphic but have selected fewer than two numerical fields. This is why you cannot...
Click on this link to search all SAP messages.