How To Fix P2871 - Activity type & used in allocation of non-measurable activities for &


P2871 - Overview

  • Message type: E = Error

  • Message class: P2 - Messages for HR Time Management

  • Message number: 871

  • Message text: Activity type & used in allocation of non-measurable activities for &

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message P2871 - Activity type & used in allocation of non-measurable activities for & ?
    The SAP error message P2871 indicates that there is an issue with the allocation of non-measurable activities in the context of activity types. This error typically arises when you are trying to allocate costs to an activity type that is not set up correctly for non-measurable activities.
    
    Cause: Activity Type Configuration: The activity type may not be configured to allow for non-measurable activities. Non-measurable activities are those that do not have a quantifiable measure (like hours or units) associated with them. Cost Center Assignment: The cost center or internal order associated with the activity type may not be set up correctly. Master Data Issues: There may be issues with the master data related to the activity type, such as missing or incorrect settings. Allocation Method: The method used for allocation may not be appropriate for non-measurable activities.
    Solution: Check Activity Type Configuration: Go to the configuration settings for the activity type in SAP (Transaction code: OAYD). Ensure that the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author