How To Fix P05FBN112 - Start date must lie before end date


SAP Error Message - Details

  • Message type: E = Error

  • Message class: P05FBN - Flexible Benefits Notifications NL

  • Message number: 112

  • Message text: Start date must lie before end date

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message P05FBN112 - Start date must lie before end date ?

    The SAP error message P05FBN112, which states "Start date must lie before end date," typically occurs in scenarios where date ranges are being defined, such as in planning, scheduling, or data entry processes. This error indicates that the start date you have entered is either the same as or later than the end date, which is not allowed in the context of the operation you are trying to perform.

    Cause:

    1. Incorrect Date Entry: The most common cause is that the user has mistakenly entered the start date as the same as or after the end date.
    2. Data Migration Issues: If data is being imported or migrated, there may be inconsistencies in the date formats or values.
    3. System Configuration: In some cases, system settings or configurations may enforce strict date validation rules.

    Solution:

    1. Check Date Inputs: Review the start and end dates you have entered. Ensure that the start date is earlier than the end date.
    2. Correct the Dates: If you find that the start date is incorrect, modify it to a date that is earlier than the end date.
    3. Validation: Implement validation checks in your data entry forms to prevent this error from occurring in the future.
    4. Consult Documentation: If you are unsure about the date formats or requirements, refer to the relevant SAP documentation or user guides for the specific module you are working with.
    5. Testing: After making corrections, test the entry again to ensure that the error does not persist.

    Related Information:

    • SAP Modules: This error can occur in various SAP modules, including SAP ERP, SAP S/4HANA, and others where date ranges are relevant (e.g., project management, HR, finance).
    • User Training: Providing training for users on how to correctly enter date ranges can help reduce the occurrence of this error.
    • SAP Notes: Check SAP Notes for any known issues or patches related to date handling in your specific version of SAP.
    • Support: If the issue persists after checking the dates, consider reaching out to your SAP support team for further assistance.

    By ensuring that the start date is always before the end date, you can avoid encountering this error in your SAP processes.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker