How To Fix P0203 - No more operations allowed after decision operation or GCY


SAP Error Message - Details

  • Message type: E = Error

  • Message class: P0 - Messages for Transactions PE01, PE02 and PE03

  • Message number: 203

  • Message text: No more operations allowed after decision operation or GCY

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message P0203 - No more operations allowed after decision operation or GCY ?

    The SAP error message P0203, which states "No more operations allowed after decision operation or GCY," typically occurs in the context of the SAP Production Planning (PP) module or when working with the SAP Advanced Planning and Optimization (APO) system. This error indicates that the system has encountered a decision point in a planning run where no further operations can be executed due to the current state of the planning process.

    Cause:

    1. Decision Operation: The error is triggered when the planning process reaches a decision operation (like a decision point in a heuristic or optimization run) and attempts to perform further operations that are not allowed at that stage.
    2. Global Control Yield (GCY): This can also occur if the planning run has reached a point where it cannot proceed due to constraints or settings that prevent further operations.
    3. Configuration Issues: Incorrect configuration of the planning parameters or heuristics can lead to this error.
    4. Data Issues: Inconsistent or incomplete master data (like material master, BOM, routing) can also cause this error.

    Solution:

    1. Review Planning Parameters: Check the planning parameters and settings in the configuration. Ensure that they are set correctly for the type of planning you are performing.
    2. Check Heuristics: If you are using heuristics, review the heuristic settings to ensure they are appropriate for your planning scenario.
    3. Data Consistency: Verify that all relevant master data (materials, BOMs, routings) is complete and consistent. Look for any missing or incorrect entries that could affect the planning process.
    4. Debugging: If you have access to debugging tools, you can trace the planning run to identify the exact point where the error occurs. This can provide insights into what is causing the issue.
    5. SAP Notes: Check the SAP Support Portal for any relevant SAP Notes that may address this specific error. There may be patches or updates that resolve known issues.
    6. Consult Documentation: Review the SAP documentation related to the planning process you are using. This can provide insights into the expected behavior and any limitations.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as MD01 (MRP Run), MD02 (Single-item, Multi-level Planning), or any specific transaction related to the planning heuristic you are using.
    • SAP Community: Engage with the SAP Community forums to see if other users have encountered similar issues and what solutions they have found.
    • Training and Resources: Consider additional training or resources on SAP PP or APO to better understand the planning processes and how to troubleshoot common errors.

    If the issue persists after trying the above solutions, it may be beneficial to reach out to your SAP support team or a consultant with expertise in SAP PP/APO for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant