How To Fix OM520 - Convert live data after activating actual cost component split


SAP Error Message - Details

  • Message type: E = Error

  • Message class: OM - Customizing Materialwirtschaft

  • Message number: 520

  • Message text: Convert live data after activating actual cost component split

  • Show details Hide details
  • What causes this issue?

    You have specified that the <ZK>actual cost component split</> is
    <ZK>active</> for one or more valuation areas. After you activate the
    actual cost component split for these valuation areas, you have to
    create that data for the actual cost component split in the production
    system. This ensures that your valuation data is consistent.

    System Response

    The system found that the <ZK>productive start of the material ledger
    </> has already been carried out. The system points out that the
    productive start for the actual cost component split (report
    "MLCCS_STARTUP") has still to be carried out.

    How to fix this error?


    1. Make a note of the valuation areas for which you have set just the
    actual cost component split to active.
    2. Save your Customizing settings.
    3. Convert the data for the actual cost component split into the new
    activated valuation areas.


    Contact your system administrator.

    Procedure for System Administrators

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message OM520 - Convert live data after activating actual cost component split ?

    The SAP error message OM520, which states "Convert live data after activating actual cost component split," typically occurs when there is an issue related to the activation of the Actual Cost Component Split (ACCS) in the Controlling (CO) module of SAP. This feature allows for a more detailed analysis of costs by breaking them down into different components.

    Cause:

    1. Activation of ACCS: The error usually arises when the Actual Cost Component Split has been activated in the system, but the necessary conversion of existing data has not been performed.
    2. Missing Data Conversion: When ACCS is activated, the system requires that existing data be converted to align with the new structure. If this conversion has not been executed, the error will occur.
    3. Configuration Issues: There may be issues with the configuration settings related to cost components or the controlling area.

    Solution:

    1. Data Conversion: You need to perform the data conversion for the existing data. This can typically be done using the transaction code KKS1 (for actual data) or KKS2 (for plan data). This process will convert the existing cost data to the new structure that includes the cost component split.

      • Go to transaction KKS1 or KKS2.
      • Follow the prompts to execute the conversion.
      • Ensure that you have the necessary authorizations to perform this action.
    2. Check Configuration: Review the configuration settings for the Actual Cost Component Split in the controlling area. Ensure that all necessary settings are correctly defined.

      • Use transaction OKTZ to check the settings for cost component structures.
      • Verify that the cost component structure is correctly assigned to the relevant controlling area.
    3. Consult Documentation: Refer to SAP documentation or notes related to the Actual Cost Component Split for any specific instructions or prerequisites that may need to be addressed.

    4. Testing: After performing the conversion, it is advisable to test the system to ensure that the error has been resolved and that the cost component split is functioning as expected.

    5. SAP Support: If the issue persists after following the above steps, consider reaching out to SAP support for further assistance. They may provide additional insights or patches if there are known issues with the version you are using.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as KKS1, KKS2, OKTZ, and others related to cost accounting.
    • SAP Notes: Check for any SAP Notes that may address specific issues or provide guidance on the ACCS feature.
    • User Roles: Ensure that the user performing these actions has the appropriate roles and permissions in SAP to execute data conversions and access configuration settings.

    By following these steps, you should be able to resolve the OM520 error and successfully implement the Actual Cost Component Split in your SAP system.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker