Do you have any question about this error?
Message type: E = Error
Message class: OM - Customizing Materialwirtschaft
Message number: 518
Message text: Select at least one cost component split
To use the actual cost component split, you must have selected at least
one type of cost component split.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Select either the main cost component split, the auxiliary cost
component split, or both types of cost component split.
Error message extract from SAP system. Copyright SAP SE.
OM518
- Select at least one cost component split ?The SAP error message OM518 ("Select at least one cost component split") typically occurs in the context of cost planning or cost allocation in SAP, particularly when working with cost component splits in controlling (CO) or product costing (CO-PC). This error indicates that the system requires at least one cost component to be selected for the operation you are trying to perform.
Cause:
- No Cost Component Selected: The most common cause of this error is that the user has not selected any cost components in the relevant screen or transaction.
- Configuration Issues: There may be issues with the configuration of cost components in the system, such as missing or incorrectly defined cost component structures.
- Data Entry Errors: Users may inadvertently skip selecting cost components due to oversight or misunderstanding of the interface.
Solution:
- Select Cost Components: Ensure that at least one cost component is selected in the relevant transaction or screen. This is usually done in the cost planning or cost allocation screens.
- Check Configuration: If the error persists, check the configuration of cost components in the system. Ensure that the cost component structure is correctly defined and that the necessary cost components are available for selection.
- Review User Input: Double-check the data entry to ensure that all required fields are filled out correctly and that the user is following the correct procedure for selecting cost components.
- Consult Documentation: Refer to SAP documentation or help resources for guidance on the specific transaction or process you are working with, as there may be additional requirements or steps needed.
Related Information:
If the issue continues after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in controlling and product costing.
Get instant SAP help. Start your 7-day free trial now.
OM517
No multi-level process categories in table CKMLMV009 --> Long text
What causes this issue? No multilevel process categories for procurement or consumption were found in table CKMLMV009 gefunden. Either the current co...
OM516
Currency/valuation profile &1 active in controlling area &2
What causes this issue? You want to cancel the activation of the material ledger. The system has discovered that the currency and valuation profile &...
OM519
You cannot go to next Customizing level for data scope &1 --> long text
What causes this issue? The scope of data key &V1& is used to define that <ZH>all</> material ledger currencies/valuations are us...
OM520
Convert live data after activating actual cost component split
What causes this issue? You have specified that the <ZK>actual cost component split</> is <ZK>active</> for one or more valua...
Click on this link to search all SAP messages.