Do you have any question about this error?
Message type: E = Error
Message class: OM - Customizing Materialwirtschaft
Message number: 517
Message text: No multi-level process categories in table CKMLMV009 --> Long text
No multilevel process categories for procurement or consumption were
found in table CKMLMV009 gefunden.
Either the current content of this table does not correspond with that
in the standard system, or a program error has occurred.
The transaction is cancelled.
Please contact your system administrator.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
OM517
- No multi-level process categories in table CKMLMV009 --> Long text ?The SAP error message OM517, which states "No multi-level process categories in table CKMLMV009," typically occurs in the context of Material Ledger and is related to the configuration of multi-level process categories in the system. This error can arise during various processes, such as when trying to execute a transaction that requires multi-level costing or when performing a material valuation.
Cause:
The error indicates that the system is unable to find the necessary multi-level process categories in the specified table (CKMLMV009). This can happen due to several reasons:
- Missing Configuration: The multi-level process categories may not have been defined or configured correctly in the system.
- Data Inconsistency: There may be inconsistencies or missing entries in the relevant tables that are required for the multi-level process.
- Incorrect Settings: The settings for the Material Ledger or the costing variant may not be set up properly to support multi-level costing.
Solution:
To resolve the OM517 error, you can follow these steps:
Check Configuration:
- Go to the configuration settings for the Material Ledger and ensure that the multi-level process categories are defined correctly.
- Use transaction code
SPRO
to access the configuration menu and navigate to:
- Controlling -> Product Cost Controlling -> Material Ledger -> Activate Material Ledger.
- Ensure that the necessary settings for multi-level costing are activated.
Review Table Entries:
- Check the entries in table
CKMLMV009
to see if the required multi-level process categories exist.- You can use transaction code
SE16N
to view the contents of the table. If the entries are missing, you may need to create or update them.Costing Variant:
- Verify that the costing variant being used supports multi-level costing. You can check this in the configuration under:
- Controlling -> Product Cost Controlling -> Costing -> Costing Variants.
- Ensure that the costing variant is set up to allow for multi-level processes.
Run Consistency Checks:
- Use transaction code
CKMLCP
to run consistency checks for the Material Ledger. This can help identify and resolve any inconsistencies in the data.Consult Documentation:
- Refer to SAP documentation or notes related to the Material Ledger and multi-level costing for additional guidance and troubleshooting steps.
Contact SAP Support:
- If the issue persists after checking the configuration and data, consider reaching out to SAP support for further assistance.
Related Information:
CKMLMV009
- Table for multi-level process categories.CKMLCP
- Consistency check for Material Ledger.SE16N
- Data browser for viewing table contents.By following these steps, you should be able to identify the root cause of the OM517 error and implement the necessary solutions to resolve it.
Get instant SAP help. Start your 7-day free trial now.
OM516
Currency/valuation profile &1 active in controlling area &2
What causes this issue? You want to cancel the activation of the material ledger. The system has discovered that the currency and valuation profile &...
OM515
If activity update indicator = &1, actual costing must be active
What causes this issue? If you want the activity data in the actual costing to be updated, the indicator for updating actual costing must be activate...
OM518
Select at least one cost component split
What causes this issue? To use the actual cost component split, you must have selected at least one type of cost component split.System Response The...
OM519
You cannot go to next Customizing level for data scope &1 --> long text
What causes this issue? The scope of data key &V1& is used to define that <ZH>all</> material ledger currencies/valuations are us...
Click on this link to search all SAP messages.