How To Fix OIUPR233 - Cannot simultaneously reallocate multiple Prod Dates for same DN, Freq.


OIUPR233 - Overview

  • Message type: E = Error

  • Message class: OIUPR - PRA Production Messages

  • Message number: 233

  • Message text: Cannot simultaneously reallocate multiple Prod Dates for same DN, Freq.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message OIUPR233 - Cannot simultaneously reallocate multiple Prod Dates for same DN, Freq. ?
    The SAP error message OIUPR233, which states "Cannot simultaneously reallocate multiple Prod Dates for same DN, Freq," typically occurs in the context of production planning and scheduling within the SAP system, particularly when dealing with demand management and production orders.
    
    Cause: This error arises when there is an attempt to reallocate multiple production dates for the same delivery note (DN) and frequency in a single operation. The system does not allow simultaneous reallocations for the same delivery note and frequency because it can lead to inconsistencies in the planning and scheduling process.
    Solution: To resolve this error, you can take the following steps: Check the Delivery Note (DN): Ensure that you are not trying to reallocate multiple production dates for the same delivery note and frequency. Review the details of the delivery note to confirm the production dates associated with it. Reallocate One at a Time: If you need to change production dates for multiple items,

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker