How To Fix OIJ_LDSCHED402 - Unit of Measure is missing for vessel drafts


SAP Error Message - Details

  • Message type: E = Error

  • Message class: OIJ_LDSCHED - TSW: Load/Discharge Scheduling Message Class

  • Message number: 402

  • Message text: Unit of Measure is missing for vessel drafts

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message OIJ_LDSCHED402 - Unit of Measure is missing for vessel drafts ?

    The SAP error message OIJ_LDSCHED402, which indicates that a "Unit of Measure is missing for vessel drafts," typically arises in the context of logistics and scheduling within the SAP Oil and Gas (OIJ) module. This error suggests that the system is unable to process vessel draft information due to the absence of a specified unit of measure (UoM).

    Cause:

    1. Missing Configuration: The unit of measure for the vessel draft may not be configured in the system.
    2. Data Entry Error: The draft information might have been entered without specifying the unit of measure.
    3. Master Data Issues: The master data for the vessel or related objects may not have the necessary UoM defined.
    4. Integration Issues: If the data is being pulled from another system, there may be issues with the data transfer or mapping.

    Solution:

    1. Check Configuration:

      • Navigate to the relevant configuration settings in SAP to ensure that the unit of measure for vessel drafts is defined.
      • Use transaction codes like SPRO to access the configuration settings and verify the UoM settings.
    2. Review Master Data:

      • Check the master data for the vessel in question. Ensure that the unit of measure is specified in the relevant fields.
      • Use transaction codes like OIJ_VESSEL to view and edit vessel master data.
    3. Data Entry Validation:

      • If the draft information is being entered manually, ensure that the user is prompted to enter a unit of measure.
      • Implement validation checks to prevent saving records without a UoM.
    4. Integration Checks:

      • If the data is being imported from another system, verify the data mapping and ensure that the UoM is included in the data transfer.
      • Check for any errors in the data import logs that might indicate issues with UoM.
    5. Consult Documentation:

      • Review SAP documentation or help resources related to the Oil and Gas module for any specific guidelines on handling vessel drafts and units of measure.
    6. Contact Support:

      • If the issue persists after checking the above areas, consider reaching out to SAP support or your internal SAP team for further assistance.

    Related Information:

    • Unit of Measure (UoM): In SAP, UoM is crucial for ensuring that quantities are correctly interpreted and processed. Common UoMs for vessel drafts might include meters, feet, or other relevant measurements.
    • SAP Notes: Check for any SAP Notes related to OIJ_LDSCHED402 for additional insights or patches that may address this issue.
    • Training and Documentation: Ensure that users are trained on the importance of entering complete data, including UoM, when dealing with vessel drafts and other logistics-related entries.

    By following these steps, you should be able to identify and resolve the issue related to the missing unit of measure for vessel drafts in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant