Message type: E = Error
Message class: OIJ_IF - OIL TSW: Messages for TSW Interfaces Layer
Message number: 179
Message text: Planned End Date/Time from for event &1 not within allowed range
The planned date and time for event &V1& are not within the allowed
range that is determined from reference document &V2&. In this
document, you define a time that the system adds to the schedule date
of &V3& &V4&.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Change the planned date and time for nomination line item event &V1& or
adapt the TSW details for the reference document for event &V1&.
Error message extract from SAP system. Copyright SAP SE.
The SAP error message OIJ_IF179, which states "Planned End Date/Time from for event &1 not within allowed range," typically occurs in the context of SAP's Oil and Gas (OIJ) module. This error indicates that the planned end date and time for a specific event (identified by &1) is not within the acceptable range defined by the system.
Cause: Date/Time Configuration: The planned end date/time may be set outside the allowed time frame defined in the system settings. This could be due to: The end date being earlier than the start date. The end date being set beyond a predefined limit (e.g., too far in the future or past). Business Rules: There may be specific business rules or constraints that dictate the allowable range for event dates/times, which are not being adhered to. Data Entry Error: A simple data entry mistake could lead to incorrect date/time values being inputted.
Solution: Check Date/Time Values: Review the planned start and end
Get instant SAP help. Sign up for our Free Essentials Plan.
OIJ_IF178
Planned Start Date/Time to for event &1 not within allowed range
What causes this issue? The planned date and time for event &V1& are not within the allowed range that is determined from reference document ...
OIJ_IF177
Planned Start Date/Time from for event &1 not within allowed range
What causes this issue? The planned date and time for event &V1& are not within the allowed range that is determined from reference document ...
OIJ_IF180
Planned End Date/Time to for event &1 not within allowed range
What causes this issue? The planned date and time for event &V1& are not within the allowed range that is determined from reference document ...
OIJ_IF181
Pegging check failed for route across nomination pegging
What causes this issue? When pegging nomination items across nominations, such as when connecting transport systems, the system performs several chec...
Click on this link to search all SAP messages.