Message type: E = Error
Message class: MW - Messages IS-R / Allocation Tables
Message number: 313
Message text: &1 error &2 during validation of date &3 in calendar &4
The system checked <GL:factory_calendar>calendar</> &v4& to determine
if the delivery date &v3& is a working day. An error occurred (&v2&)
during this check.
INCLUDE ISR_VERARBEITUNG
Explanation of the error
1 Calendar &v4& not found.
No check possible.
Create a calendar or maintain a different calendar for the plant.
2 The delivery date &v3& is after the end of the validity period of
calendar &v4&.
No check possible.
Choose a different delivery date or extend the validity period of the
calendar.
3 The delivery date &v3& is before the beginning of the validity
period of calendar &v4&.
No check possible.
Choose a different delivery date or extend the validity period of the
calendar.
10 The <DS:DE.SPBEDAT>order date</> cannot be determined correctly.
During scheduling, the planned delivery time was subtracted from the
delivery date to result in order date &V3&. This date is not, however,
within the validity period of the calendar &V4&. As a result, the GR
processing time can no longer be included in the calculation.
Choose a different delivery date or extend the validity period of the
calendar.
11 Error calling function module.
This is probably a program error, Inform SAP.
12 Calendar &V4& cannot be loaded.
This is probably a program error, Inform SAP.
13 Delivery date is not correct.
This is probably a program error, Inform SAP.
If you extend the validity period of the calendar, this does not affect
existing allocation table items.
Error message extract from SAP system. Copyright SAP SE.
MW313
- &1 error &2 during validation of date &3 in calendar &4 ?The SAP error message MW313 typically occurs during the validation of a date in a calendar, indicating that there is an issue with the date being processed. The error message format is as follows: MW313: "Error &1 during validation of date &2 in calendar &3"
Cause: The error can be caused by several factors, including: Invalid Date: The date being validated may not exist in the specified calendar. For example, if the date is a weekend or a holiday that is not recognized in the calendar. Calendar Configuration: The calendar configuration may not be set up correctly, leading to discrepancies in date validation. Date Format Issues: The date format being used may not match the expected format in the SAP system. System Settings: There may be system settings or user parameters that are affecting how dates are validated.
Solution: To resolve the MW313 error, you can take the following steps: Check the Date: Verify that the date being processed is
Get instant SAP help. Sign up for our Free Essentials Plan.
MW312
Material status of material &1 does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MW311
Material &1: allocation table processing not defined.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MW314
Message & will be deleted
What causes this issue? The current item contains a material of a category for which no messages have been defined. Messages are only possible for si...
MW315
Quota will be copied to plants of plant group & and deleted
What causes this issue? In the current allocation table item, a fixed allocation rule is used, that is, the quotas have been maintained for each plan...
Click on this link to search all SAP messages.