Message type: E = Error
Message class: MPE_PLAN_RTG_VERS - Manage Production Routing Version
Message number: 089
Message text: Object creation error
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MPE_PLAN_RTG_VERS089
- Object creation error ?The SAP error message MPE_PLAN_RTG_VERS089 typically indicates an issue related to the creation of a planning version in the SAP system, particularly in the context of SAP Integrated Business Planning (IBP) or SAP Advanced Planning and Optimization (APO). This error can arise due to various reasons, including configuration issues, data inconsistencies, or missing authorizations. Possible Causes:
Configuration Issues: The planning version may not be properly configured in the system. This could include missing settings or incorrect parameters. Data Inconsistencies: There may be inconsistencies in the master data or transaction data that prevent the creation of the planning version. Authorization Problems: The user attempting to create the planning version may not have the necessary authorizations to perform this action. System Errors: There could be underlying system errors or bugs that are causing the issue. Solutions: Check Configuration: Review the configuration settings for the planning version in the relevant transaction (e.g., /SAPAPO/VER for APO). Ensure that all required fields and parameters
Get instant SAP help. Sign up for our Free Essentials Plan.
MPE_PLAN_RTG_VERS088
Critical error
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_RTG_VERS087
Conversion error
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_RTG_VERS090
Object load error
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_RTG_VERS091
Serialized object cannot be assigned to non-serialized routing
What causes this issue? You are currently processing a shop floor routing for a non-serialized product and are trying to assign an object that was cr...
Click on this link to search all SAP messages.