How To Fix MPE_PLAN_PV006 - &1:Task List assigned to diff. plant &2 &3


SAP Error Message - Details

  • Message type: E = Error

  • Message class: MPE_PLAN_PV - Production Version

  • Message number: 006

  • Message text: &1:Task List assigned to diff. plant &2 &3

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MPE_PLAN_PV006 - &1:Task List assigned to diff. plant &2 &3 ?

    The SAP error message MPE_PLAN_PV006 typically indicates that there is an issue with the assignment of a task list to a different plant than expected. This error often arises in the context of production planning and control, where task lists (such as routing or production versions) are associated with specific plants.

    Cause:

    The error message MPE_PLAN_PV006 occurs when:

    • A task list (routing or production version) is assigned to a plant that is different from the one being processed in the transaction.
    • There may be a mismatch in the configuration or master data where the task list is not correctly assigned to the intended plant.

    Solution:

    To resolve this error, you can take the following steps:

    1. Check Task List Assignment:

      • Go to the relevant transaction (e.g., CA03 for routing or C223 for production versions) and verify the assignment of the task list to the plant.
      • Ensure that the task list is correctly assigned to the plant you are trying to use.
    2. Correct Plant in Transaction:

      • If you are processing a transaction for a specific plant, ensure that you are using the correct plant code. If you are inadvertently using a different plant, switch to the correct one.
    3. Review Master Data:

      • Check the material master data (transaction MM03) to ensure that the correct task list is assigned to the material for the specific plant.
      • Verify that the production version is correctly set up for the material in the relevant plant.
    4. Consult Configuration:

      • If the issue persists, consult with your SAP configuration team to ensure that the task list assignment settings are correctly configured in the system.
    5. Check for Transport Issues:

      • If the task list was recently transported from another environment (e.g., development to production), ensure that the transport was successful and that all necessary objects were included.
    6. SAP Notes:

      • Check the SAP Support Portal for any relevant SAP Notes that may address this specific error message or provide additional troubleshooting steps.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CA03 (Display Routing), C223 (Maintain Production Versions), and MM03 (Display Material).
    • Documentation: Review SAP documentation related to production planning and task list management for further insights.
    • User Roles: Ensure that you have the necessary authorizations to view and modify task lists and related master data.

    By following these steps, you should be able to identify and resolve the issue causing the MPE_PLAN_PV006 error message in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant