Do you have any question about this error?
Message type: E = Error
Message class: MPE_PLAN_PV - Production Version
Message number: 004
Message text: &1:BOM exists &2 &3
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MPE_PLAN_PV004
- &1:BOM exists &2 &3 ?The SAP error message MPE_PLAN_PV004 typically indicates that there is an issue related to the Bill of Materials (BOM) in the planning process. The message format suggests that it is informing you that a BOM exists for a specific material and plant combination, which may not be expected in the context of the operation you are trying to perform.
Cause:
BOM Exists: The error indicates that a BOM exists for the material in the specified plant. This could be due to:
- The material is set up for production or planning, and the system is trying to process it in a way that conflicts with the existing BOM.
- The BOM may not be correctly configured or may not match the expected structure for the operation you are trying to perform.
Incorrect Configuration: There may be an issue with the configuration of the material master or BOM settings that is causing the system to throw this error.
Planning Scenario: The error may arise in specific planning scenarios where the system expects a different setup (e.g., a material that should not have a BOM).
Solution:
Check BOM Configuration:
- Go to the BOM transaction (CS03) and check the BOM for the material and plant specified in the error message. Ensure that it is correctly configured and that the components are valid.
Review Material Master:
- Check the material master data (MM03) for the material in question. Ensure that the settings related to planning and production are correctly configured.
Analyze Planning Parameters:
- Review the planning parameters and settings in the relevant planning transaction (e.g., MD01, MD02). Ensure that the planning strategy and other settings align with the intended use of the material.
Consult Documentation:
- Refer to SAP documentation or help resources for specific details on the error message and its implications. This can provide insights into how to resolve the issue based on your specific configuration.
Contact SAP Support:
- If the issue persists after checking the above points, consider reaching out to SAP support for further assistance. They can provide more detailed analysis and troubleshooting based on your system configuration.
Related Information:
By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
MPE_PLAN_PV003
&1:Task list marked for deletion &2 &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_PV002
&1:BOM is marked for deletion &2 &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_PV005
&1:Task list exists &2 &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_PV006
&1:Task List assigned to diff. plant &2 &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.