Message type: E = Error
Message class: MPE_PLAN_MEC - Message Class for Manufacturing Engineering Cockpit
Message number: 031
Message text: Change relevance Reference or linked to Reference not configured
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MPE_PLAN_MEC031
- Change relevance Reference or linked to Reference not configured ?The SAP error message MPE_PLAN_MEC031 typically indicates that there is an issue with the configuration of change relevance for a reference or linked object in the planning process. This error often arises in the context of SAP's Material Requirements Planning (MRP) or similar planning modules where certain objects or references are expected to have specific configurations for change relevance.
Cause: Configuration Issue: The error usually occurs when the system expects a certain configuration for change relevance that has not been set up. This could be due to missing settings in the planning configuration or master data. Missing Reference: The reference or linked object that is supposed to be configured for change relevance is either not defined or not properly linked in the system. Data Inconsistency: There may be inconsistencies in the master data or planning data that prevent the system from recognizing the change relevance.
Solution: Check Configuration: Go to the configuration settings for the planning area
Get instant SAP help. Sign up for our Free Essentials Plan.
MPE_PLAN_MEC030
Production order key not passed for assignment
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_MEC029
Routing keys not passed for assignment
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_MEC032
BOM version does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_MEC033
BOM version keys not passed for net change determination
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.