Do you have any question about this error?
Message type: E = Error
Message class: MPE_PLAN_MEC - Message Class for Manufacturing Engineering Cockpit
Message number: 030
Message text: Production order key not passed for assignment
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MPE_PLAN_MEC030
- Production order key not passed for assignment ?The SAP error message MPE_PLAN_MEC030 indicates that a production order key was not passed for assignment during a planning or execution process. This error typically arises in the context of production planning and execution, particularly when dealing with production orders, material requirements planning (MRP), or similar processes.
Cause:
- Missing Production Order: The production order key may not have been created or may not exist in the system.
- Incorrect Configuration: There may be issues with the configuration of the production planning module or the specific transaction being executed.
- Data Inconsistencies: There could be inconsistencies in the data being processed, such as missing or incorrect entries in related tables.
- Authorization Issues: The user may not have the necessary authorizations to access or manipulate the production order data.
- System Bugs: Occasionally, this error can be caused by bugs in the SAP system or specific transactions.
Solution:
- Check Production Order: Verify that the production order exists and is correctly set up in the system. You can do this by using transaction codes like CO03 (Display Production Order) to check the order details.
- Review Configuration: Ensure that the configuration settings for production planning and order management are correctly set up. This may involve checking settings in the customizing (SPRO) area.
- Data Validation: Check for any inconsistencies in the data related to the production order. This may involve reviewing related master data, such as material master records and BOMs (Bill of Materials).
- User Authorizations: Ensure that the user executing the transaction has the necessary authorizations to access and manipulate production orders.
- Consult SAP Notes: Look for any relevant SAP Notes or patches that may address this specific error. You can search the SAP Support Portal for known issues and solutions.
- Debugging: If you have access to development tools, you may want to debug the transaction to identify where the error is occurring in the code.
Related Information:
If the problem persists after trying the above solutions, it may be beneficial to engage with your SAP support team or a consultant who specializes in SAP production planning.
Get instant SAP help. Start your 7-day free trial now.
MPE_PLAN_MEC029
Routing keys not passed for assignment
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_MEC028
Planning scope keys not passed for assignment
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_MEC031
Change relevance Reference or linked to Reference not configured
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_MEC032
BOM version does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.