Message type: E = Error
Message class: MPE_PLAN_MEC - Message Class for Manufacturing Engineering Cockpit
Message number: 004
Message text: BOM not assigned to any open CR
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MPE_PLAN_MEC004
- BOM not assigned to any open CR ?The SAP error message MPE_PLAN_MEC004 indicates that a Bill of Materials (BOM) is not assigned to any open Change Request (CR). This typically occurs in the context of Material Requirements Planning (MRP) or when trying to perform operations that require a valid BOM.
Cause: No Active Change Request: The BOM you are trying to use is not linked to any active or open Change Request. This can happen if the BOM is newly created or modified but not yet released or assigned to a CR. BOM Status: The BOM might be in a status that does not allow it to be used for planning or production.
Configuration Issues: There may be configuration issues in the system that prevent the BOM from being recognized as valid for the current operation.
Solution: Check BOM Assignment: Go to the BOM management transaction (e.g., CS02 or CS03) and check if the BOM is assigned to an open Change Request. If it is
Get instant SAP help. Sign up for our Free Essentials Plan.
MPE_PLAN_MEC003
BOM not assigned to any CR
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_MEC002
Please enter the parameters
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_MEC005
No BOMs exist for the keys passed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_MEC006
Change record &1 is not open
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.