Message type: E = Error
Message class: MPE_PLAN_MEC - Message Class for Manufacturing Engineering Cockpit
Message number: 003
Message text: BOM not assigned to any CR
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MPE_PLAN_MEC003
- BOM not assigned to any CR ?The SAP error message MPE_PLAN_MEC003 indicates that a Bill of Materials (BOM) is not assigned to any Change Request (CR). This error typically arises in the context of production planning or material management when trying to perform operations that require a BOM to be linked to a specific change request.
Cause: Missing BOM Assignment: The BOM you are trying to use is not linked to any change request in the system. Incorrect Configuration: The configuration settings for the BOM or the change request might not be set up correctly. Data Inconsistency: There may be inconsistencies in the data, such as the BOM being created but not properly assigned to a change request. Authorization Issues: Sometimes, the user may not have the necessary authorizations to view or assign BOMs to change requests.
Solution: Check BOM Assignment: Go to the BOM management transaction (e.g., CS02 or CS03) and check if the BOM is assigned to the correct change request. If it
Get instant SAP help. Sign up for our Free Essentials Plan.
MPE_PLAN_MEC002
Please enter the parameters
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_MEC001
No EBOMs exist for the change record &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_MEC004
BOM not assigned to any open CR
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_MEC005
No BOMs exist for the keys passed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.