How To Fix MPE_PLAN_EXEC014 - New version of shop floor BOM created successfully


MPE_PLAN_EXEC014 - Overview

  • Message type: E = Error

  • Message class: MPE_PLAN_EXEC - Message Class for Planning to Execution

  • Message number: 014

  • Message text: New version of shop floor BOM created successfully

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MPE_PLAN_EXEC014 - New version of shop floor BOM created successfully ?
    The SAP error message MPE_PLAN_EXEC014 indicates that a new version of a shop floor Bill of Materials (BOM) has been created successfully. This message is not necessarily an error but rather an informational message indicating that the system has successfully generated a new version of the BOM.
    
    Cause: The message is triggered during the process of creating or updating a BOM in the SAP system. It signifies that the system has completed the task of versioning the BOM, which is a normal part of BOM management in SAP. This can occur during various processes, such as production planning, material requirements planning (MRP), or when manually creating or changing a BOM.
    Solution: Since this message is informational, there is typically no action required unless you are experiencing issues related to the BOM versioning process. However, if you are looking to ensure that the BOM is functioning as expected, consider the following steps: Verify BOM Version: Check the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker