How To Fix MPE_PLAN_EXEC013 - Shop floor BOM updated successfully


MPE_PLAN_EXEC013 - Overview

  • Message type: E = Error

  • Message class: MPE_PLAN_EXEC - Message Class for Planning to Execution

  • Message number: 013

  • Message text: Shop floor BOM updated successfully

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MPE_PLAN_EXEC013 - Shop floor BOM updated successfully ?
    The SAP error message MPE_PLAN_EXEC013 indicates that a shop floor Bill of Materials (BOM) has been updated successfully. However, this message is typically not an error but rather an informational message indicating that the system has processed the update of the BOM in the context of production planning or execution.
    
    Cause: The message is generated when a BOM is modified or updated in the system, and the update process has completed successfully. This could occur during various operations, such as: Changes made to the BOM structure. Updates to component quantities or descriptions. Adjustments to the BOM validity dates.
    Solution: Since MPE_PLAN_EXEC013 is an informational message rather than an error, no specific action is required to resolve it. However, if you are looking to ensure that the BOM updates are correct, you can take the following steps: Verify the BOM Changes: Check the BOM in the system to ensure that the updates reflect the intended changes. You can do

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker