How To Fix MPE_PLAN_EXEC008 - Usage for planning BOM has not been maintained


SAP Error Message - Details

  • Message type: E = Error

  • Message class: MPE_PLAN_EXEC - Message Class for Planning to Execution

  • Message number: 008

  • Message text: Usage for planning BOM has not been maintained

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MPE_PLAN_EXEC008 - Usage for planning BOM has not been maintained ?
    The SAP error message MPE_PLAN_EXEC008 indicates that the usage for the Bill of Materials (BOM) has not been maintained. This error typically occurs when you are trying to execute a planning function that requires a BOM, but the system cannot find the necessary usage information for that BOM.
    
    Cause: Missing BOM Usage: The BOM usage has not been defined for the material in question. BOM usage specifies the context in which the BOM is valid (e.g., production, engineering, etc.). Incorrect Configuration: The configuration settings for the BOM may not be set up correctly, leading to the system not recognizing the BOM usage. Material Master Data Issues: The material master data may not be properly maintained, which can lead to issues with BOM usage.
    Solution: Maintain BOM Usage: Go to the transaction code CS01 (Create BOM) or CS02 (Change BOM). Enter the material number and plant. Ensure that the BOM usage is correctly defined. Common usages include: 1: Production 2: Engineering 3: Sales Save

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant