Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: MPE_PLAN_EXEC - Message Class for Planning to Execution
Message number: 006
Message text: BOM usage does not support planning or shop floor execution
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MPE_PLAN_EXEC006
- BOM usage does not support planning or shop floor execution ?The SAP error message MPE_PLAN_EXEC006 indicates that the Bill of Materials (BOM) usage you are trying to work with does not support planning or shop floor execution. This error typically arises in the context of production planning and execution processes within SAP.
Cause:
- BOM Usage Configuration: The BOM usage you are trying to use is not configured to be utilized for planning or execution. In SAP, BOMs can have different usages (e.g., production, engineering, etc.), and not all usages are valid for all processes.
- Incorrect BOM Type: The BOM type may not be appropriate for the operation you are trying to perform. For example, if you are trying to execute a production order that references a BOM type that is not set up for production planning, this error can occur.
- Master Data Issues: There may be issues with the master data setup, such as missing or incorrect BOMs for the material in question.
Solution:
- Check BOM Usage: Verify the BOM usage in the BOM master data. Ensure that the BOM usage is set correctly for the intended planning or execution process. You can do this by navigating to the BOM in the SAP GUI and checking the usage settings.
- Review BOM Types: Ensure that the BOM type you are using is appropriate for the production order or planning activity. You may need to create or modify a BOM to use a different type that supports planning.
- Update Master Data: If the BOM is not set up correctly, you may need to create a new BOM or modify the existing one to ensure it is valid for the intended usage.
- Consult Documentation: Refer to SAP documentation or help resources for specific details on BOM usage and types to ensure compliance with your organization's processes.
- Check Configuration Settings: If you have access to configuration settings, check the settings related to BOM usage in the SAP IMG (Implementation Guide) under the relevant production planning or BOM sections.
Related Information:
CS01
(Create BOM), CS02
(Change BOM), and CS03
(Display BOM) to manage BOMs.By following these steps, you should be able to identify the cause of the error and implement the necessary changes to resolve it.
Get instant SAP help. Sign up for our Free Essentials Plan.
MPE_PLAN_EXEC005
Invalid BOM details
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_EXEC004
No changes found between planning BOM and shop floor BOM
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_EXEC007
Usage for shop floor BOM has not been maintained
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_EXEC008
Usage for planning BOM has not been maintained
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.