Message type: E = Error
Message class: MPE_PLAN_ENG_SNPSHT - Message class for Engineering Snapshots
Message number: 039
Message text: Planning scope creation failed
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MPE_PLAN_ENG_SNPSHT039
- Planning scope creation failed ?The SAP error message MPE_PLAN_ENG_SNPSHT039 indicates that there was a failure in creating a planning scope in the SAP system, specifically within the context of the SAP Integrated Business Planning (IBP) or SAP Advanced Planning and Optimization (APO) modules. This error can arise due to various reasons, and understanding the cause is crucial for finding an appropriate solution. Possible Causes:
Configuration Issues: Incorrect or incomplete configuration of the planning area or planning scope can lead to this error. Data Inconsistencies: Missing or inconsistent master data or transactional data that the planning scope relies on. Authorization Issues: The user may not have the necessary authorizations to create or modify planning scopes. Technical Errors: System-related issues, such as database problems or system performance issues, can also cause this error. Version Conflicts: If there are multiple versions of the planning scope or planning area, conflicts may arise. Solutions: Check Configuration: Review the configuration settings for the planning area and planning scope. Ensure
Get instant SAP help. Sign up for our Free Essentials Plan.
MPE_PLAN_ENG_SNPSHT037
Only BOM or document item deletion changes found for snapshot revision &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_ENG_SNPSHT036
Number range interval not assigned in snapshot configuration
What causes this issue? A number range interval has not been configured for the engineering snapshot in Customizing.System Response The system issue...
MPE_PLAN_ENG_SNPSHT040
Change record creation failed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_ENG_SNPSHT041
Change preparation failed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.