Do you have any question about this error?
Message type: E = Error
Message class: MPE_PLAN_ENG_SNPSHT - Message class for Engineering Snapshots
Message number: 036
Message text: Number range interval not assigned in snapshot configuration
A number range interval has not been configured for the engineering
snapshot in Customizing.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
In the Customizing activity
<DS:SIMG.MPE_SNP_NR_V>Assign Number Range to Snapshot</>, assign a
number range interval to the engineering snapshot for creating snapshot
IDs.
Error message extract from SAP system. Copyright SAP SE.
MPE_PLAN_ENG_SNPSHT036
- Number range interval not assigned in snapshot configuration ?The SAP error message MPE_PLAN_ENG_SNPSHT036 indicates that there is an issue with the number range interval not being assigned in the snapshot configuration for planning or engineering processes. This error typically arises in the context of SAP's planning applications, such as SAP Integrated Business Planning (IBP) or SAP S/4HANA.
Cause:
The error is caused by the absence of a defined number range interval for the snapshot configuration. This means that the system does not know which number range to use when creating or processing snapshots, which are essential for various planning and reporting functions.
Solution:
To resolve this error, you need to ensure that a number range interval is properly assigned in the snapshot configuration. Here are the steps to do this:
Access the Configuration:
- Go to the relevant configuration area in your SAP system. This could be through transaction codes like
SPRO
for customizing or through the specific application configuration area.Navigate to Snapshot Configuration:
- Find the section related to snapshot configuration. This may vary depending on the specific SAP module you are using (e.g., IBP, S/4HANA).
Assign Number Range Interval:
- Look for the option to define or assign a number range interval. You may need to create a new number range or select an existing one that fits your requirements.
- Ensure that the number range is active and properly configured.
Save Changes:
- After making the necessary changes, save your configuration.
Test the Configuration:
- Try to execute the process that was previously causing the error to ensure that the issue has been resolved.
Related Information:
SNRO
(for number range objects) to manage number ranges.By following these steps, you should be able to resolve the MPE_PLAN_ENG_SNPSHT036 error and ensure that your snapshot configuration is correctly set up.
Get instant SAP help. Start your 7-day free trial now.
MPE_PLAN_ENG_SNPSHT035
BOM usage &1 not relevant for production
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_ENG_SNPSHT034
Provide change record type that is configured for internal number range
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_ENG_SNPSHT037
Only BOM or document item deletion changes found for snapshot revision &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_ENG_SNPSHT039
Planning scope creation failed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.