Do you have any question about this error?
Message type: E = Error
Message class: MPE_PLAN_ENG_SNPSHT - Message class for Engineering Snapshots
Message number: 025
Message text: Invalid material &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MPE_PLAN_ENG_SNPSHT025
- Invalid material &1 ?The SAP error message MPE_PLAN_ENG_SNPSHT025 with the description "Invalid material &1" typically occurs in the context of planning and engineering processes within SAP, particularly when dealing with materials in the system. Here’s a breakdown of the potential causes, solutions, and related information for this error:
Causes:
- Material Not Found: The material number specified in the error message does not exist in the system or is not active.
- Incorrect Material Type: The material may not be of the correct type for the operation being performed (e.g., it might be a non-stock material when a stock material is required).
- Authorization Issues: The user may not have the necessary authorizations to access the material data.
- Data Inconsistencies: There may be inconsistencies in the material master data, such as missing or incorrect entries in required fields.
- Inactive Material: The material might be marked as inactive or obsolete in the system.
Solutions:
- Verify Material Existence: Check if the material number exists in the system. You can do this by using transaction codes like MM03 (Display Material) or MM02 (Change Material).
- Check Material Status: Ensure that the material is active and not marked for deletion. You can check this in the material master data.
- Review Material Type: Confirm that the material type is appropriate for the operation you are trying to perform. If necessary, consult with your SAP master data team to ensure the material type is correct.
- Authorization Check: Ensure that the user has the necessary authorizations to access the material. This may involve checking user roles and permissions.
- Correct Data Inconsistencies: If there are inconsistencies in the material master data, work with your data management team to correct them.
- Consult Documentation: Review any relevant SAP documentation or notes related to this error message for additional context or updates.
Related Information:
If the issue persists after following these steps, it may be beneficial to engage your SAP support team or consult with an SAP expert for further investigation.
Get instant SAP help. Start your 7-day free trial now.
MPE_PLAN_ENG_SNPSHT024
EBOM version for matl &1, plant &2, usage &3, alternative &4 not released
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_ENG_SNPSHT023
Change record exists for all EBOM versions with target planning scope
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_ENG_SNPSHT026
Invalid plant &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_ENG_SNPSHT027
Invalid BOM usage &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.